Building a new home in Central Florida often looks cheaper on paper than buying one: a lot price plus a builder’s per-square-foot number. The real total is bigger. County impact fees and utility connections can add tens of thousands of dollars, the construction loan charges interest while the house goes up, Florida taxes every new mortgage, and you keep paying for a place to live until move-in day. This calculator adds all of it up and compares it with buying a similar existing home. For the background on each cost, see what it costs to build a house in Central Florida and new construction vs. an existing home.
Short version: With the defaults, a 2,000-square-foot home on a $100,000 lot in unincorporated Orange County costs about $570,900 to build, counting $171 a square foot for construction, a 10% cushion, $33,923 in county fees and the permit, about $19,500 in construction-loan interest, Florida’s mortgage taxes, and 12 months of housing while you wait. Buying a similar $450,000 home costs about $486,600 including closing costs and a year of mortgage interest. Building comes out ahead only when the lot is cheap, the build price is firm, and similar existing homes cost noticeably more.
Central Florida Buy vs Build Calculator
Compares the full cost of building on your own lot, including county fees, financing while the house goes up, and where you live in the meantime, with buying a similar existing home.
How this works: Construction is the square footage times the cost per square foot, plus site work and your cushion for overruns. County impact fees, utility connection fees, and the permit are filled in from each county’s published schedules for a home of about 2,000 square feet in the unincorporated area; existing homes already paid theirs. To compare like with like over the build period, the building side counts the rent or mortgage you keep paying until you move in, and the buying side counts the mortgage interest you’d pay on the existing home over the same months. Interest while building assumes a construction loan covering the same share of the cost as the down payment you chose, paid interest-only: the lot portion for the full build time and the construction portion at about half its balance on average, since the lender pays the builder in draws as work is finished.
Florida taxes: Each new mortgage owes documentary stamp tax of 35 cents per $100 and nonrecurring intangible tax of 2 mills, 0.55% together. If you use separate lot, construction, and permanent loans, each one can be taxed again, so ask about a single-close construction-to-permanent loan.
Not included: Design and engineering fees, builder’s risk insurance, property tax during construction (a home not substantially complete on January 1 is taxed on the land only that year), furniture, and moving. Defaults were last updated in November 2026. For the full list of fees, use the New Home Fee calculator.
How to use the calculator
Pick the county and enter the home’s heated square footage. The calculator fills in that county’s impact fees, its water and sewer connection fee where the county provides service, and an estimated building permit, all for a home of about 2,000 square feet in the unincorporated area. Impact fees change with size, location, and the county’s fee zones, so check the exact number in the New Home Fee calculator or our guide to impact fees by county. Inside a city, or on a lot with a well and septic, replace the utility fee with your own number.
Next, enter the lot price and the builder’s cost per square foot. The default, $171, is the national median contract price for custom homes started in 2025, not counting the lot. Real bids depend on the plans, finishes, and builder, so use yours. Site work is left at zero because it varies so much: a cleared lot on a paved road with city water needs little, while a wooded rural lot can need clearing, fill, a driveway, a well, and a septic system. Our article on hidden costs of building lists what to price, and site prep and land clearing covers the permits. The cushion for overruns is your own allowance for change orders and surprises.
Then set the timeline and financing. Census data shows contractor-built homes took about 11.7 months from permit to completion in 2025, and design and permitting come before that, so 12 months is a reasonable starting point. The construction loan rate is an example; use your lender’s quote. The housing cost is the rent or mortgage you keep paying until you move in. On the buying side, enter the price of a similar existing home and any repairs it would need soon, such as an old roof or AC. The calculator also counts the mortgage interest you’d pay on that home over the same months, so both sides cover the same stretch of time.
As an example, take the defaults in unincorporated Orange County: a 2,000-square-foot home at $171 a square foot is $342,000, plus a $34,200 cushion, $24,663 in impact fees, an $8,060 water and sewer connection, and a $1,200 permit. With a $100,000 lot, 20% down, an 8% construction loan for 12 months, 2% lender and title costs, and $2,400 a month in rent, building totals about $570,894. Buying a similar $450,000 home with the same down payment, 2% closing costs, Florida’s mortgage taxes, and 12 months of interest at 7.11% totals about $486,576, so buying comes out about $84,300 cheaper. Adding $40,000 of site work raises the cost to build to about $617,376.
When building can make sense anyway
The calculator compares cost, not value. A new home comes with a builder warranty, a new roof, AC, and water heater, current hurricane and energy codes, and often lower insurance premiums, while an older home may need several of those replaced within a few years. That’s what the repairs box is for. Building also makes sense when no existing home has what you need, such as acreage, a specific layout, or accessibility features. On the other side, building carries risks the numbers can’t show: price increases during construction, delays, and the work of managing a project. Our guides to the steps and timeline for building in Florida and construction loans and draws walk through how to manage them.
One Florida detail helps a little: a home that isn’t substantially complete on January 1 is taxed on the land only that year. And watch the financing structure. Every new mortgage in Florida owes documentary stamp tax and intangible tax, 0.55% of the loan together, so separate lot, construction, and permanent loans can mean paying it more than once.
Frequently Asked Questions
It depends on the lot price, the build price, and what similar existing homes sell for. With our defaults in unincorporated Orange County, a 2,000-square-foot home costs about $570,900 to build on a $100,000 lot, compared with about $486,600 to buy a similar $450,000 home, counting fees, financing, and housing costs during the build.
The national median contract price for custom homes started in 2025 was $171 per square foot, not counting the lot, according to NAHB’s analysis of Census data. In Central Florida, add county impact fees, utility connections, permits, and site work, which can add tens of thousands of dollars.
Census data shows homes built by hired contractors took about 11.7 months from permit to completion in 2025. Design, engineering, and permitting come before that.
Mainly county impact fees for roads, schools, parks, and public safety, plus water and sewer connection fees and the building permit. For a 2,000-square-foot home in unincorporated areas, impact fees alone range from about $9,800 in Brevard to about $37,700 in Osceola.
A construction loan is usually paid interest-only while the house is built, and the lender pays the builder in draws, so you pay interest only on what’s been drawn. Each new mortgage in Florida also owes 0.55% in documentary stamp and intangible taxes, so separate lot, construction, and permanent loans can mean paying that more than once.
No. It leaves out design and engineering fees, builder’s risk insurance, property tax during construction, furniture, and moving. Site work is left at zero because it varies so much by lot, so get quotes and enter your own number.
Sources
- NAHB Eye on Housing: Custom home premium highest since 2011 (September 2026)
- NAHB Eye on Housing: Single-family home construction time declines in 2025 (September 2026)
- Freddie Mac: Primary Mortgage Market Survey
- Florida Statutes, Section 201.08: Documentary stamp tax on notes and mortgages
- Florida Statutes, Section 199.133: Nonrecurring intangible tax
This article is for general informational purposes only and isn’t financial, legal, insurance, or tax advice – for guidance specific to your situation, talk to a licensed professional.